Skip to Content (Press Enter)
 Logo

Protector X

The new standard in friction management. It’s not every day that a new standard in trackside friction management is introduced to market, but that’s exactly what L.B. Foster Friction Management has achieved with the launch of its groundbreaking PROTECTOR®X.

PROTECTOR®X system provides unsurpassed performance, reliability, and ease of maintenance in both gauge face and top of rail friction management applications. Its unique, steep-walled, conical product compartment design enasures first-in, first-out product utilization.

The new units are designed specifically to reduce track access requirements for installation, maintenance and refilling. Plus we’ve designed in a special double wall that meets strict Environment Protection Agency secondary containment requirements.

Joel VanderMarel, P.Eng., is L.B. Foster’s Global FM Product Manager – Trackside Solutions. He explains: “The PROTECTOR®X system’s extraordinary design is optimised to deliver up to 100% product utilization before cavitation. That’s a figure we’re confident will outperform any trackside friction management dispensing solutions currently on the market.

“Our innovative control system uses proprietary compensation algorithms to ensure a consistent application rate regardless of changing operating conditions. So that means you can be assured that PROTECTOR®X will keep on performing whatever the weather throws at it.”

PROTECTOR®X features a large, high capacity compartment available in three sizes:

  • 50 USG/400 lbs (190 L/180 kg)

  • 100 USG/800 lbs (380 L/360 kg)

  • 160 USG/1250 lbs (610 L/570 kg).

VanderMarel continues: “When designing the PROTECTOR®X we really wanted to find smart ways to make installing and maintaining the system as simple and straightforward as possible. The new units are designed specifically to reduce track access requirements for installation, maintenance and refilling. Plus we’ve designed in a special double wall that meets strict Environment Protection Agency secondary containment requirements.”

An optional Remote Performance Monitoring (RPM) system, developed by L.B. Foster, allows users to monitor the status of trackside systems remotely. The RPM system gives equipment owners the capability to maximize operating uptime of units, optimizing the deployment of maintenance resources.

  • .
    • .

    We are L.B. Foster

    We enjoy a market-leading reputation for high quality, high performance solutions in rail and infrastructure.

    • Harness the strength of our global network
    • L.B. Foster spans North America, South America, Europe, and Asia
    • Seamless global operations and efficient delivery of our products and services

    When you choose to partner with L.B. Foster, you're not just selecting a vendor; you're aligning with a trusted global leader renowned for its commitment to excellence and superior performance.

    Man working on rail track at night, wearing protective mask and helmet.

    Global Rail Solutions

    Our end-to-end critical engineering solutions fulfil an essential role in maintaining the safe and reliable operation of rail networks around the world.

    CXT Denali Flush Restroom.

    Innovative Infrastructure

    We are experts at designing, manufacturing and deploying advanced technologies that positively impact the built environment.